I’ve got 2 50A 14-50 outlets. If I could do it over, I’d have put a 100A subpanel in the garage instead of running those separate circuits though.
I am using the Ford Mobile connector for the Mach-E and only really need a 40A circuit for that. I have a 48A capable OpenEVSE that I plan to use for the Lightning, but since I only have a 50A circuit, I need to set it to 40A.
Had I had installed a subpanel, it’d have been easy to redo the run to that outlet with larger wire vs the 30 ft run all over again.
We’re probably moving later this year, so that’s what I will likely do next time.
I am using the Ford Mobile connector for the Mach-E and only really need a 40A circuit for that. I have a 48A capable OpenEVSE that I plan to use for the Lightning, but since I only have a 50A circuit, I need to set it to 40A.
Had I had installed a subpanel, it’d have been easy to redo the run to that outlet with larger wire vs the 30 ft run all over again.
We’re probably moving later this year, so that’s what I will likely do next time.