I was wondering if they must of run out of money or something. For example, they have a charger in Worthington, MN basically built, but never turned on. Further, they were planning to build out the I-90 corridor in SD, and nothing has happened since they turned on a single charger in Wall, SD. This remains the only EA charger in SD, and it literally the only charger over 100 kwh in the entire state. Let hope this, and Biden's money, gets some change happening.
I figure they've been slow playing it waiting on more government money. American business is the worst, they aren't going to do much without getting their pockets lined.I was wondering if they must of run out of money or something. For example, they have a charger in Worthington, MN basically built, but never turned on. Further, they were planning to build out the I-90 corridor in SD, and nothing has happened since they turned on a single charger in Wall, SD. This remains the only EA charger in SD, and it literally the only charger over 100 kwh in the entire state. Let hope this, and Biden's money, gets some change happening.