Yeah thats my impression. So far most of the trucks we have seen delivered have been moving away from Dearborn. Seen Chicago, Tennessee, Kentucky, Virginia, etc. Seems to be like a wave moving away from point of impact. Im in St. Louis area and the dealerships around here are expecting their mannequins next week with my truck being expected in late June.I have an XLT SR scheduled for 6/6, that hasn’t changed as far as the website goes. Like Voltz said, probably has to do with spec and what parts are readily available on the line right now. Seems like a lot of lariats are being built. Mine is speced with 312A, which shares a lot of parts with the lariat trim. Could also be shipping related, I’m guessing they want to group the orders going to similar destinations.
My lariat standard range went from 7/18 to 6/20 and is now 7/4 also.Lariat S/R was 7/28 now went to 7/4
Folks need to remember that these changes are from the WEEK of 7/11 to the WEEK of 7/18. You may have just been bumped from a Saturday to a Sunday.My SR XLT was just bumped from 7/11 to 7/18.
Just was moved to 7/11/22.Lariat S/R was 7/28 now went to 7/4
Now 9/26XLT Standard Battery
Originally scheduled for production on 6/13. It then got pushed back to 7/25. Then to 8/1. And now 8/29. This happening to everyone?