It might be produced in time but it won't be delivered in 2022 unless the truck fairy is sitting on your shoulder.
It might be produced in time but it won't be delivered in 2022 unless the truck fairy is sitting on your shoulder.Sorry for duplicating post I’ll try to delete other. I have a 12/19/22 build date in my 23 ER Lariat with spray in liner what’s the possibility of my truck being built prior to the 12/24-1/8 production shut down. I currently don’t even have a window sticker in the system so I don’t see a blend date. I’m not sure what’s the time frame on start to finish on trucks currently.
I've deleted your other thread for you.Sorry for duplicating post I’ll try to delete other.