Sorry for duplicating post I’ll try to delete other. I have a 12/19/22 build date in my 23 ER Lariat with spray in liner what’s the possibility of my truck being built prior to the 12/24-1/8 production shut down. I currently don’t even have a window sticker in the system so I don’t see a blend date. I’m not sure what’s the time frame on start to finish on trucks currently.